What’s new? v4.116 — Progress on every task, and the same plan in Iurefficient and iureproject

Every task now has its own % complete, which is no longer lost when syncing with iureproject, and the .iurp file can be imported and exported from Tasks.
v4.116.1 — Background tasks run again
Version 4.116.0 was built with a newer release of an internal library (the one that connects to the task queue) that was not compatible with the server’s. As a result, chat replies, OCR, document indexing, transcriptions and scheduled alerts stopped being processed. This version pins the library to the one that worked; nothing else changes.
v4.116.0 — Progress on every task, and the same plan in Iurefficient and iureproject
Until now a task’s progress was only inferred from its status: “In Progress” was always 50%, and whatever someone typed as progress in iureproject was lost on the next sync. Now every task has its own % complete. You type it in the task panel, in the Sheet, or by dragging the bar in the Gantt; if nobody types it, it comes from the status or from actual versus estimated hours, and the screen tells you where the number comes from. Typing 100 completes the task. The project Summary weights by hours, so a big task counts for what it should.
Teams that plan in iureproject can carry the plan back and forth without losing anything: progress travels with the sync, and the .iurp file is imported and exported from Tasks. Importing updates the same tasks instead of duplicating them, respects board statuses and milestones, and keeps the original file in the project’s documents.